§ 38-128. Preparation of map.  


Latest version.
  • Upon the construction of the street and drainage facilities by the subdivider, who has a right of payback for the construction of such street or drainage facility, the city shall prepare a map indicating the area within which any use or benefit from the street or drainage facilities would require a payback to the subdivider who initially constructed the street or drainage facility. This map designating the area in which a payback would result shall be placed of public record at the city hall and all developers applying for permits shall be made aware of the existence of the map and the cost of developing and using the street and drainage facilities.

(Code 1978, § 5-74; Code 1993, § 66-139)